Bell Creek Nornico project (withdrawn)

Project summary

QLD Gold Pty Ltd was the proponent for the Bell Creek Nornico Project. QLD Gold Pty Ltd is a wholly owned subsidiary of Metallica Metals Limited. The Project was proposed to be located 30km south of Mt Garnet in north Queensland on Mining Lease Application (MLA) 20549. The proponent had proposed to mine lateritic ore and process it using a heap leach operation to produce nickel and cobalt hydroxides.

The project was being assessed by a voluntary environmental impact statement (EIS) under Part 1 of Chapter 3 of the Environmental Protection Act 1994. The terms of reference was finalised and issued to the proponent on 26 July 2007. However, on 1 March 2011 the proponent formally withdrew its application to voluntarily prepare an EIS for the Bell Creek Nornico project.

The proponent proposed to downgrade the project from a level 1 to a level 2 mining project as the processing of the 1.5 million tonnes per year (Mt/y) of mined laterite ore would now be done at the proposed Nornico North Project near Greenvale.

QLD Gold Pty Ltd has applied to incorporate MLA 20549 into a non-code compliant level 2 Environmental Authority (EA) of the Nornico North tenements (MLs 4187 & 4188, EPMs 11285, 10235, 14101 & 14518 and MDL 387).

Final Terms of Reference (TOR)

The Terms of Reference was finalised and issued to the proponent on 26 July 2007.

The proponent was in the process of preparing the EIS which would have been made available for public notification. However, on 1 March 2011 the proponent formally withdrew its application to voluntarily prepare an EIS for the Bell Creek Nornico project.

Documents

Further information

For further information about the EIS process for the Bell Creek Nornico project, contact the EIS Coordinator on 13QGOV (13 74 68) or email eis@des.qld.gov.au